Pick a weight you can lift for eight clean reps. Start with eight sets of two, then add one rep to one set each session. The weight stays the same until you can do all eight sets for three reps. I’d use this with an experienced lifter who needs more quality reps on one main lift over several sessions.
Power work from eight doubles to eight triples
Rest two to three minutes between sets. Keep the lift, setup and rest interval consistent, and put the triples first while you’re fresh. If you start with 100 kg on the bench press, every set in the progression is at 100 kg.
- Session 1: Eight doubles for 16 total reps.
- Session 2: One triple, then seven doubles for 17 total reps.
- Session 3: Two triples, then six doubles for 18 total reps.
- Session 9: Eight triples for 24 total reps, if you’ve made every progression.
The early doubles should feel repeatable. If you miss a rep or shorten the range of motion to finish it, repeat that session’s prescription the next time you bench. Once all eight triples meet the same standard, add a small amount of weight and start again at eight doubles.
Pump work from three sets of six to three sets of eight
In Hepburn’s Program A, take five minutes after the power sets, then reduce the load by about 20%. If you benched 100 kg for the power work, start the pump work at about 80 kg for three sets of six.
Add one rep to one set at a time. Start at 6/6/6, then go to 7/6/6 and 7/7/6. Keep going until you reach 8/8/8. Increase the pump load and return to three sets of six. Track that progression separately from the power work. If the pump sets reach 8/8/8 while you’re still building the triples, reset the pump sets and keep the power sets on their current progression.




